Barreda accompanies Principe de Asturias Inaugurat
- July 27th, 2010
- Posted in Sports
- Write comment
Barreda accompanies Principe de Asturias Inauguration Bolarque reservoir.
Toledo, July 25 .- The President of Castilla-La Mancha, Jose Maria Barreda, is joining the Prince of Asturias morning at the opening ceremony of the hydraulic complex 'Los Molinos' Bolarque reservoir in Almonacid de Zorita (Guadalajara).
It so informs the Board in a statement that this reservoir is celebrating a century since it was opened by Prince Philip's great-grandfather, King Alfonso XIII, a June 23, 1910.
, mortal gold, It was now one of the first Spanish hydroelectric power generating alternating current and the construction of the hydraulic and Dam began in 1907 and was, in the year 1908, with 1,300 workers.
This is one of the largest projects of the time, both in equipment and personnel, which greatly increase the population in the region.
Bolarque began to grow with, buy kinah, the construction of the Central Almoguera Zorita and that in 1947, are attached to the system from Madrid and it was in 1954 when it launched the central 'I Bolarque' which involves the closure of the above.
Recrecio the dam to 642 meters with a collection of 30.7 Hm 3 of water, coinciding with the construction of reservoirs Entrepe?as and Buendia, and machinery stripped of, aika gold, the old Central Bolarque became an excellent museum and technical historical.
A second project, 'Reversible Bolarque', inaugurated by the then Prince Juan Carlos de Bourbon, in 1974, was dammed to build on diverting water from the Tagus to the Segura, which was built for a pumping station that raises the water at the dam Bujedo in La Sierra de Altomira, from which and the water falls by gravity to the reservoir of El Talave, and in the Segura basin.
The third project, the small scale 'Bolarque The Mills', at 4.33 megawatts of installed capacity, will be inaugurated tomorrow by Prince Philip, who has been undertaken by the company 'Generation Peninsular', owned by Union Fenosa, which performs a more efficient use of the ecological flow of the Tagus and caters to a thousand families.
The new plant is located on the left bank downstream of the dam and its function will be to maximize the flow of necessary maintenance on the Tagus, and currently used by the central Bolarque I, so as to increase production to improve performance of current machines.